Home › Guides › How long a makeover takes

How long does a kitchen makeover take?

A kitchen makeover usually takes 4 to 5 days to fit. Old doors and worktops come off, new worktops go on, then the new doors, drawer fronts, panels and handles. It is quick because the cabinets stay on the wall, so there is no rip-out and no replastering. A doors-only job takes a day or two.

By , The Kitchen Renovators · Last updated:

Key points

  • Most makeovers are fitted in 4 to 5 days.
  • Doors and drawer fronts on their own usually take a day or two.
  • The kitchen is never stripped out, so you are not left with an empty room.
  • Expect a short spell without the sink or hob while the worktops are changed.
  • Your part is small: clear the worktops and make room for the van.

What happens before the fitting days?

The days on site are the end of the process, not the start. First there is a free home visit, where you see door styles and talk through what you want. A written quote follows. If you are happy, I come back for a pre-survey visit with samples of your exact doors and worktops, take the final measurements, and a deposit books you in. Then everything is ordered and your fitting slot is booked.

The doors are made to measure, so they are made for your kitchen once the order goes in. You will be told your fitting date when the slot is booked.

What does the week look like, day by day?

Every kitchen runs slightly differently. This is a typical order for a full kitchen makeover. You get the plan for your own kitchen at the pre-survey visit.

DayWhat usually happensWhat it means for you
1Floors and surfaces protected. Old doors, drawer fronts and worktops come off.The kitchen looks bare but the cabinets and their contents are still there.
2New worktops fitted. Sink and hob go back in.This is the spell without the sink or hob.
3New doors hung on new hinges. Drawer fronts and runners fitted.The kitchen starts to look finished.
4End panels, plinths, trims and handles. Flooring and appliances, if they are part of the job.Freestanding appliances are moved and put back for you.
5Final adjustments and clean-up. Rubbish loaded into the van.The kitchen is ready to use.

A smaller kitchen with no flooring or appliance work sits at the 4-day end. A larger one with a new floor and several appliances takes the full 5.

A finished makeover in Malvern with sage green shaker doors, pale worktops and a built-in double oven
A finished makeover in Malvern: new doors, worktops, sink and hob on the existing cabinets.

Why is it so much quicker than a new kitchen?

The slow parts of a new kitchen are not the fitting. They are the rip-out, the making good and the waiting between trades. A makeover skips all three. The cabinets stay fixed to the wall, the walls behind them are never exposed, and the work runs straight through. The guide on a makeover versus a new kitchen compares the two side by side.

Can you use the kitchen while the work is going on?

Mostly, yes. Your cupboards keep their contents and the fridge stays on. The time you will notice is when the worktops are changed, because the sink and hob have to come out and go back in. A kettle and a microwave in another room cover that gap.

What do you need to do?

  • Clear the worktops and windowsills completely before day 1.
  • Empty any cupboards and drawers I ask you to at the pre-survey visit.
  • Leave space for the van as close to the door as you can.
  • Keep pets and small children out of the room during working hours.
  • Say early if a date matters, such as family arriving.

What if you only want part of the job?

Replacement doors and drawer fronts on their own are usually done in a day or two. What to expect at the first appointment is covered in what happens at a free home visit.

The timings are the same wherever you are, whether that is Pershore, Ledbury or Stourport-on-Severn.

How long a makeover takes

Quick answers

Most kitchen makeovers are fitted in 4 to 5 days. A doors and drawer fronts job on its own usually takes a day or two.

No. The cabinets stay in place and keep their contents. There is a short spell without the sink or hob while the worktops are changed.

Clear the worktops fully. You will be told at the pre-survey visit which cupboards and drawers, if any, need emptying.

Want a date for your kitchen?

It starts with a free home visit. From there you get a written quote and a fitting slot.

Rated 5.0 on Google (10 reviews) · 6-year warranty · Fully insured

Call Us Book a Free Home Visit